Steel Door Specification & Submittal Checklist
Use this checklist when preparing a steel-door specification, submittal, purchase order, or final approval package. Project requirements should be matched to the exact selected door and current supporting documentation.
1. Product Identification
- Exact product/model name
- Single, double, sidelight, transom, or specialty configuration
- Nominal size and exact unit/frame dimensions
- Steel profile/system where applicable
- Stock or custom status
2. Opening & Frame Coordination
- Project rough opening
- Frame outside dimensions
- Jamb depth / wall thickness
- Threshold/sill condition
- Finished floor elevation
- Anchoring and substrate conditions
3. Handing & Swing
- Inswing or outswing
- Hinge side using an agreed reference side
- Active/passive leaf for double doors
- Hardware/lockset location
- Approved handing diagram where available
4. Glazing & Finish
- Lite pattern / glass configuration
- Glass type where applicable
- Finish/color
- Interior/exterior finish requirements
5. Hardware Preparation
- Lockset preparation
- Pull/lever/handle requirements
- Smart-lock preparation where applicable
- Closer, panic, or specialty hardware if specified
6. Performance Documentation
When the project requires thermal, impact, wind, structural, fire, NFRC, U-factor, or other regulated performance, request the exact current report mapped to the selected model and configuration. Do not transfer ratings between different profiles or historical orders.
7. Final Approval Package
- Approved dimensions
- Approved handing/swing
- Approved glazing
- Approved finish
- Approved hardware preparation
- Current drawings/specifications
- Required test/approval documents
Related resources: Steel Door Technical Resources | Rough Opening Guide | Handing & Swing Guide